Notice: wpdb::prepare was called incorrectly. The query does not contain the correct number of placeholders (2) for the number of arguments passed (3). Please see Debugging in WordPress for more information. (This message was added in version 4.8.3.) in /srv/www.aplicatorgroup.com/htdocs/wp-includes/functions.php on line 4196
Construction | Aplicator

Arabic Tower

Aplicator equipment

Hotel interior

Aplicator equipment

Balcony

Aplicator equipment

Note

The balconies are made in open mould process using Aplicator’s powerful IPS-8000 spray up machine. Gelcoat with Aplicator’s reliable IPG-8000.

Aplicator equipment

Note

The facing are made in an automated process using Aplicator’s powerful IPS-8000 spray up machine. Gelcoat applied with Aplicator’s reliable IPG-8000.

Aplicator equipment

Septic tank

Aplicator equipment

Note

The tanks are made in open mould process using Aplicator’s powerful IPS-8000 spray up machine and IPL-8000 roller machine. Aplicator’s heavy duty putty machine IPP-8000/T200 is used for bonding.